top of page
INSTALLING CSF RAIL

IMPORTANT!

Rail installation can be performed with CSF supplied parts or McCue supplied parts.
Parts and instructions differ.

 

Confirm the parts you have before proceeding:

  • Check your kick-off email.

  • Check the packaging. CSF rail is crated. McCue rail is wrapped in corrugate.

PREPARE RAIL

1_place rubber tubing.jpg
1

Slide tubing onto leg until it is snug with the cap. Trim 1/4”-3/8” longer than the leg.

2_remove rubber tubing.jpg
2

The longer tubing length should fill the drilled hole.

PREPARE LEGS

1-slide legs.png
1

Slide legs into rail at correct at correct position for run type.

3_tighten.png
3

Tighten on both ends to secure joiner
and rail.

2_use joiner.png
2

Use joiner to secure rail sections together.

4_snap end cap.png
4

Snap in the end cap to finish a straight run.

INSTALL RAIL

5_position legs over holes.png

Position legs over holes and firmly insert rail.

6_tighten legs.png

Tighten legs.

1
2

PREPARE & INSTALL CORNERS

leg spacing w caps_rev.png
Corners 1.png
1

Position legs over holes and firmly insert rail.

Corners 3_add screws.png
3

Add screws through pilot holes to attach corner to rail.

Corners 2.png
2

Put corner in place and drill 2 pilot holes
on each side through the corner piece into the rail.

Corners 4.png
4

Do not overtighten screws.

bottom of page