INSTALLING CSF RAIL
IMPORTANT!
Rail installation can be performed with CSF supplied parts or McCue supplied parts.
Parts and instructions differ.
Confirm the parts you have before proceeding:
-
Check your kick-off email.
-
Check the packaging. CSF rail is crated. McCue rail is wrapped in corrugate.
PREPARE RAIL

1
Slide tubing onto leg until it is snug with the cap. Trim 1/4”-3/8” longer than the leg.

2
The longer tubing length should fill the drilled hole.
PREPARE LEGS

1
Slide legs into rail at correct at correct position for run type.

3
Tighten on both ends to secure joiner and rail.

2
Use joiner to secure rail sections together.

4
Snap in the end cap to finish a straight run.
INSTALL RAIL

1

2
Tighten legs.
Position legs over holes and firmly insert rail.
REINFORCE RAIL SEAMS

1
Measure 2” from top and 2” from both sides of seam.

3
Use a counter sink bit on the pilot holes.

2
Drill a pilot hole on each side of rail seam.

4
Drill through the rail and joiner to secure.
PREPARE & INSTALL CORNERS


1
Position legs over holes and firmly insert rail.

3
Add screws through pilot holes to attach corner to rail.

2
Put corner in place and drill 2 pilot holes on each side through the corner piece into the rail.

4
Do not overtighten screws.